Application of the technology for co-disposal of waste rock and tailings in a tailing pool
tailing pond,weste rock dump,co-disposal,seepage,stability
摘要录用
永波 郄 / 北京矿冶科技集团有限公司
Aim at saving land resources and reducing project investment cost,the technology for co-disposal of waste rock and tailings was applied to a tailing pool in its design process, and the tailings dam was formed accompany with waste rock stockpiling with maximum elevation of 182m and width of 496m . This engineering layout is very rare at home and abroad,and the seepage and stability of tailings dam are the key factors of the project.This paper mainly introduced the technology for co-disposal of waste rock and tailings,researched the three-dimensional seepage and dam stability in the running of the tailing pool.The study results show that the tailings dam has characteristics of low infiltration line and well stability. The results can provide reference for similar engineering research and design.
重要日期
  • 会议日期

    10月22日

    2018

    10月24日

    2018

  • 05月31日 2018

    摘要截稿日期

  • 07月05日 2018

    初稿截稿日期

  • 08月10日 2018

    初稿录用通知日期

  • 10月24日 2018

    注册截止日期

主办单位
北京科技大学
McGill University
中国矿业大学(北京)
河南理工大学
University of Wollongong
东北大学
重庆大学
中国矿业大学
Laurentian University
辽宁工程技术大学
西安科技大学
北方工业大学
江西理工大学
黑龙江科技大学
协办单位
中国职业安全健康协会
中国安全生产科学研究院
煤炭信息研究院
中安安全工程研究院
International Journal of Mining Science and Technology
Safety Science
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询