1001 / 2019-05-09 11:12:55
A Robust Reserve Scheduling Method Considering Wind Turbine Generator’s De-loading Control
De-loading control,reserve scheduling,robust optimization,spatial branch-bound method
全文录用
Aijun Zhang / Inner Mongolia Power Research Institute
Dandan Li / Inner Mongolia Power Research Institute
Huadong Xing / Inner Mongolia Power Research Institute
Zhen Wang / Zhejiang University
Chaoran Si / Zhejiang University
The active power control makes wind turbine generators (WTG) have the ability to suppress the wind power fluctuations and relieve the system reserve burden. This paper proposes a robust reserve scheduling method that can consider the uncertainty of wind power and load with prediction error information given only, in which the WTG de-loading control is introduced and the robust constraints including the wind farm reserve and spinning reserve limits are formulated. Furthermore, the robust optimization model can be transformed into a certainty optimization counterpart based on duality theorem. The linear relaxation handling and the spatial branch-bound method are applied to achieve the global optimum. Finally, a modified IEEE 39-bus system with WTG integrated is used to validate the effectiveness of the proposed method.
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询