Missing-operation Risk of Directional Comparison Teleprotection with Photovoltaic Power Integration
Directional element,measuring impedance,photovoltaic (PV) power plant,weak power side,teleprotection
全文录用
Qingrui Tu / System Operation and Control Center of Guangdong Power Grid, CSG
Yiquan Li / System Operation and Control Center of Guangdong Power Grid, CSG
Wei Liu / System Operation and Control Center of Guangdong Power Grid, CSG
Xuyang Deng / System Operation and Control Center of Guangdong Power Grid, CSG
Shaolin Jiao / System Operation and Control Center of Guangdong Power Grid, CSG
Zengchao Wang / System Operation and Control Center of Guangdong Power Grid, CSG
Ziliang Wu / System Operation and Control Center of Guangdong Power Grid, CSG
Jianglei Suo / System Operation and Control Center of Guangdong Power Grid, CSG
Dongyuan Shi / Huazhong University of Science and Technology
Although the ac fault current provided by photovoltaic (PV) power plant is limited as a weak power or a electric load, the voltage and current directions are different from convention synchronous source, since the current is controlled by the PV inverters. This paper investigates the measuring impedance and directional element of PV side line protections. The impedance trajectory are drawn and compared with conventional power source. Simulation result shows that the directional comparison teleprotection may miss operate under a line internal fault, since the measuring impedance drops into the negative direction area, even though the control word Weak Power Side is activated.
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询