835 / 2019-04-29 21:56:48
Misoperation Analysis and Preventive Measures of 500 kV Reactor Protection
Reactor protection; Secondary circuit; Misoperation analysis; Preventive measures
全文录用
This paper introduces the process of checking, analyzing and dealing with the causes of maloperation of the first set protection of 500 kV reactor in a substation.By checking the secondary circuit of 500 kV reactor protection for power outage, it is analyzed that the main cause of reactor protection malfunction is that the cable core of the current circuit of the first set protection is damaged at the secondary junction box of TA of the high voltage bushing, which causes the induction current to enter in series, and causes the abnormal sampling of the first set of protection B phase, and causes the protection outlet action.Aiming at the existing problems, we give the corresponding treatment methods and preventive measures.
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询