Research on Gas Protection Misoperation Mechanism and Strategy in Switching Process of On-Load Tap Changer for Large Capacity Transformer
编号:101 访问权限:仅限参会人 更新:2020-11-11 12:09:36 浏览:145次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The arc generated when the on-load tap-changer (OLTC) is switched can cause the insulating oil inside the oil tank to surge. With the increase of transformer capacity, the oil surge is very severe due to the large arc current during the switching process, and the gas protection misoperation accident occurs frequently. This paper first analyzes the characteristics of the oil flow velocity in the connecting pipe of oil conservator when faults of different severity occur, and then compares it with the oil flow velocity characteristics in the case of normal switching of OLTC. Finally, according to the difference of flow characteristics in two cases, two strategies for dealing with gas protection misoperation are proposed. One is to reset the settings of the gas protection, and the other is the delay strategy.
关键词
on-load tap changer,flow velocity,gas protection,misoperation,strategy
报告人
Jianan Si
Xi’an Jiaotong University

稿件作者
Jianan Si Xi’an Jiaotong University
Zhiguo Hao Xi’an Jiaotong University
Ya Zhang Xi’an Jiaotong University
Shaoyong Yao Xi’an Jiaotong University
Guocheng Ding State Grid Anhui Electric Power Co., LTD.
Xingwang Wu State Grid Anhui Electric Power Co., LTD.
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询