A Robust Reserve Scheduling Method Considering Wind Turbine Generator’s De-loading Control
编号:131 访问权限:仅限参会人 更新:2020-11-11 12:09:44 浏览:131次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
The active power control makes wind turbine generators (WTG) have the ability to suppress the wind power fluctuations and relieve the system reserve burden. This paper proposes a robust reserve scheduling method that can consider the uncertainty of wind power and load with prediction error information given only, in which the WTG de-loading control is introduced and the robust constraints including the wind farm reserve and spinning reserve limits are formulated. Furthermore, the robust optimization model can be transformed into a certainty optimization counterpart based on duality theorem. The linear relaxation handling and the spatial branch-bound method are applied to achieve the global optimum. Finally, a modified IEEE 39-bus system with WTG integrated is used to validate the effectiveness of the proposed method.
关键词
De-loading control,reserve scheduling,robust optimization,spatial branch-bound method
报告人
Zhen Wang
Zhejiang University

稿件作者
Aijun Zhang Inner Mongolia Power Research Institute
Dandan Li Inner Mongolia Power Research Institute
Huadong Xing Inner Mongolia Power Research Institute
Zhen Wang Zhejiang University
Chaoran Si Zhejiang University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询