Improvement Measures of Active Intervention Arc Suppression Technology
编号:156 访问权限:仅限参会人 更新:2020-11-11 12:09:52 浏览:148次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
In order to solve the problems of active intervention arc extinction device, such as PT inrush current, overvoltage after arc extinction and low start-up sensitivity for high impedance grounding faults, a new method which is the active intervention arc extinction device parallels with arc suppression coil is proposed in this paper. Its role for suppressing PT inrush current, post-overvoltage and significantly improving the start-up sensitivity is demonstrated. Effectiveness of the method is verified by experimental tests.
关键词
distribution network,single-phase grounding,active intervention arc suppression,arc-suppression coil,start-up sensitivity
报告人
Jinwei QI
State Grid Nanchang Power Supply Company

稿件作者
Qingpeng LI State Grid Nanchang Power Supply Company
Qin YANG State Grid Nanchang Power Supply Company
Rongrong ZHANG State Grid Nanchang Power Supply Company
Jinwei QI State Grid Nanchang Power Supply Company
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询