Personal safety analysis of live working in 10kV distribution network based on finite element method
编号:248 访问权限:仅限参会人 更新:2020-11-11 12:10:15 浏览:175次 张贴报告

报告开始:暂无开始时间(12)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

暂无文件

摘要
In order to reduce the power outage time caused by the maintenance and replacement of equipment on the transmission line, live working is widely used in the operation and maintenance of distribution network in China. Because the line is in a live operation state in this mode of operation, the operators are under potential safety risks on the line. In the event of an accident, their personal safety is threatened. In this paper, the electric shock mechanism of 10kV distribution network under live operation is studied. The simulation software Ansys/Maxwell is used to build the distribution network line and tower model. The electric field strength and potential distribution of the charged working space and the operator's body surface are analyzed based on finite element method.
关键词
live working,personal safety,electric field strength,electric potential,finite element method
报告人
Zhao Zimo
Changsha University of Science & Technology

稿件作者
Zhao Zimo Changsha University of Science & Technology
Zeng Xiangjun ChangSha university of science and technology
Yu Kun ChangSha university of science and technology
Zhu Liang State Grid Hunan Electric Power Company
Yang Qi State Grid Hunan Transmission Maintenance Company
Wang Zhigang State Grid Hunan Transmission Maintenance Company
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询