1160 / 2020-09-29 17:52:02
The Defective Causes Analysis for a Batch of Current Transformers based on Simulation Tests
current transformer,constant voltage and current,dissolved gas,manufacturing process,simulation test
全文被拒
Wang Qiong / the Inner Mongolia Electric Power Science & Research Institute, Inner Mongolia Grid
  Recently, quality problems were found successively in more than ten current transformers (CTs), which were produced in a same batch, in Guangming switch station of Inner Mongolia province. Both the capacitance and dielectric loss did not meet the requirement of criteria. And the contents of dissolved gas in oil in those CTs exceeded the warming value. However, no abnormality was found in all parts of the transformer during the disassembling process. In view of this, two defective models were prepared by using the LB6-110W type of transformers separately. One of them was improper dried whereas the other was simply oil-immersed without using vacuum. The development process of defects in current transformer was studied. It was believed that the unsatisfactory vacuum immersion oil is the main cause for the failure of this batch of CTs. Based on this research, corresponding technical suggestions were put forward.

 
重要日期
  • 会议日期

    11月02日

    2020

    11月04日

    2020

  • 10月27日 2020

    初稿截稿日期

  • 11月03日 2020

    报告提交截止日期

  • 11月04日 2020

    注册截止日期

  • 11月17日 2020

    终稿截稿日期

主办单位
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
承办单位
Huazhong University of Science and Technology
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询