129 / 2021-10-27 10:41:58
Design of special hoisting equipment for substation
全文被拒
Huashen Guan / Jiangmen Power Supply Bureau of Guangdong Power Grid Co.;LTD.
Hua Wang / College of Mechanical and Power Engineering, China Three Gorges University
Wei Zou / Jiangmen Power Supply Bureau of Guangdong Power Grid Co.;LTD.
Guozheng Huang / Jiangmen Power Supply Bureau;GuangDong power Grid Corp.
Guofu Sun / Jiangmen Power Supply Bureau of Guangdong Power Grid Co.;LTD.;Jiangmen,Guangdong 529000,China
Junjie Zhang / Jiangmen Power Supply Bureau of Guangdong Power Grid Co.;LTD.
In the current installation or maintenance process of large substation equipment, due to the lack of special hoisting equipment to cope with complex substation operation conditions, resulting in long power maintenance time, construction personnel safety can not be guaranteed and other problems.For these issues, this paper proposes a new type of substation special hoisting equipment program and designed a related mechanical structure.The equipment uses the bottom crawler walking mechanism to enter the narrow working space, and uses the frog legs to achieve balance and prevent overturning. The three-degree-of-freedom double mechanical arm and the high-altitude manned device carry out the hoisting of the substation equipment and the human intervention of the equipment, so as to complete the accurate and efficient hoisting operation of substation equipment.
重要日期
  • 会议日期

    07月11日

    2023

    08月18日

    2023

  • 11月10日 2021

    初稿截稿日期

  • 12月10日 2021

    注册截止日期

  • 12月11日 2021

    报告提交截止日期

主办单位
IEEE IAS
承办单位
IEEE IAS Student Chapter of Southwest Jiaotong University (SWJTU)
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
IEEE PELS (Power Electronics Society) Student Chapter of HUST
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询