145 / 2021-10-28 12:35:19
Design of on-line monitoring system for end shield of transformer high voltage bushing
high voltage bushing,high speed acquisition circuit,insulation defect,on-line monitoring,the vibration test
终稿
Jia Xie / State Grid Anhui Electric Power Co. Ltd
Haitao Yang / State Grid Anhui Electric Power Co. Ltd. Electric Power Research Institute
Guocheng Ding / State Grid Anhui Electric Power Co. Ltd Electric Power Research Institute
Xiaoyu Hu / State Grid Anhui Electric Power Co. Ltd Electric Power Research Institute
Chenchen Zhang / State Grid Anhui Electric Power Co. Ltd Electric Power Research Institute
Jie Wu / State Grid Anhui Electric Power Co. Ltd
Bushing maintenance is a normal operation in power substations, but the maintenance cycle is too long in fixed period power outage maintenance schemas which decreasing the maintenance accuracy. In this paper, an on-line brushing monitoring system is proposed to change the situation. A kind of on-line monitoring device for the end shield of the bushing is developed to ensure casing equipment insulation defects in time. According to the structure of the system, the design of the local signal conditioning circuit, the high-speed acquisition circuit and the power function circuit are demonstrated. Finally, the test results show that the on-line monitoring system is effective for monitoring the test results show that the on-line monitoring system is effective for monitoring the running state of high voltage busing in real time.
重要日期
  • 会议日期

    07月11日

    2023

    08月18日

    2023

  • 11月10日 2021

    初稿截稿日期

  • 12月10日 2021

    注册截止日期

  • 12月11日 2021

    报告提交截止日期

主办单位
IEEE IAS
承办单位
IEEE IAS Student Chapter of Southwest Jiaotong University (SWJTU)
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
IEEE PELS (Power Electronics Society) Student Chapter of HUST
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询