报告清单
我的报告
[295]Effect of electrode structure on the packing material surface discharge characteristics in dielectric barrier discharge
HuShengyu Nanjing University of Aeronautics and Astronautics
Z /Z15
仅限参会人 张贴报告
[294]Lightning Protection for the Transmission Line of ± 800kV UHVDC Single Circuit and 500kV EHVAC Double Circuit Erected on the Same Tower
ZhangLiuchun ProfessionalEngineer China Electric Power Research Institute
Z /Z16
仅限参会人 张贴报告
[293]Three-Voltage Vector Model Predictive Torque Control Strategy for Open-Winding PMSM Under Variable DC Bus Voltage Condition
XuJiayang Nanjing University of Aeronautics and Astronautics
Z /Z2
仅限参会人 张贴报告
[289]883-Research on Power Smoothing Control Method of Impulse Load
YeCheng Xi'An University of Technology
Z /Z13
仅限参会人 张贴报告
[287]Research on Project Duration Prediction Based on Multiple Linear Regression
Yong Pan 国网江苏省电力有限公司
Z /Z11
仅限参会人 张贴报告
[286]Terminal Sliding-Mode Observer for PMSM with Resistance Identification
DongWang 哈尔滨理工大学
Z /Z2
仅限参会人 张贴报告
[285]Research on Lightning Protection of VMIP ±350kV Transmission Line
ZhangLiuchun ProfessionalEngineer China Electric Power Research Institute
Z /Z16
仅限参会人 张贴报告
重要日期
  • 会议日期

    05月27日

    2022

    05月29日

    2022

  • 02月28日 2022

    初稿截稿日期

  • 05月29日 2022

    注册截止日期

  • 06月22日 2022

    报告提交截止日期

主办单位
IEEE Beijing Section
China Electrotechnical Society
Southeast University
协办单位
IEEE Industry Applications Society
IEEE Nanjing Section
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询