Simulation of Interval Excavation of Marble Slope by ABAQUS Finite Element Method
编号:775 访问权限:仅限参会人 更新:2021-12-03 10:29:07 浏览:100次 张贴报告

报告开始:2021年12月18日 22:25(Asia/Shanghai)

报告时间:15min

所在会场:[T2] Track II Transportation Infrastructure Engineering [S2-4] Simulation and Characterization on Transportation Materials

暂无文件

摘要
The stability of marl slope is prominent when it is swelled by water. In order to enhance the stability of slope excavation process, interval excavation is adopted. Through ABAQUS finite element method, the spacing excavation modes and the influencing factors of spacing excavation of marl slope are numerically simulated. The three excavation processes of transverse sequential excavation, longitudinal sequential excavation and spacing excavation are simulated respectively. The distribution and characteristics of stress and strain are analyzed. It is concluded that spacing excavation mode has the least disturbance to soil. It is concluded that the excavation interval should be designed according to the minimum strength under the maximum rainfall when the excavation interval is designed; the excavation interval should be reduced from 32 m to 20 m when the foot of the slope increases from 27 degrees to 36 degrees; and the excavation interval should be reduced from 40 m to 20 m when the height of the slope increases from 15 m to 30 m.
关键词
CICTP
报告人
Jiayu Wang
Hubei Provincial Road & Bridge Group Co., LTD.

稿件作者
Jiayu Wang Hubei Provincial Road & Bridge Group Co., LTD.
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询