The construction of the foundation pit has a negative impact on the existing shield tunnel below, and if not properly controlled, it could lead to construction risks and affect operational safety. In this paper, the construction of a viaduct pit over an existing metro tunnel is used as an example, then the soil and tunnel deformation under various construction conditions are analyzed by numerical method and the effect of strengthening measure is quantified. The results show that the shield tunnel produced a large vertical deformation and a small horizontal displacement during the construction, while grouting can reduce the ground uplift by about 30% and the deformation of the existing tunnel by 50%.
关键词
暂无
报告人
Xiaofan NIE
Engineering Computing Centre, Beijing Urban Construction Design and Development Group Co., Ltd.

发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    07月08日

    2022

    07月11日

    2022

  • 07月11日 2022

    报告提交截止日期

  • 07月11日 2022

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Central South University (CSU)
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询