123 / 2023-10-18 10:02:49
500kV Transmission Tower Safety Assessment under Foundation Erosion by River Water
Transmission tower,Safety assessment,Erosion,Finite element,stress
终稿
Li Zhang / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
Zhiqiang Feng / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
Yu Shen / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
Xueming Zhou / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
Yao Yao / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
Xiaopeng Liu / Electric Power Research Institute State Grid Hubei Electric Power Co., Ltd.
This paper proposed a safety assessment method for 500kV transmission tower under foundation erosion by river water based on water level, geological survey, and finite element mechanical calculation. The displacement of the transmission tower foundation has been analyzed, and the main causes of the tower deformation have been summarized. The 1:1 refined finite element model of transmission tower-line system has been established, and the tower deformation and stress of different beam types of the transmission tower have been analyzed. Results show that the rapid drop of the water level and uneven slip of foundation are the root causes of the inclination of the tower, and beams near the first transverse diaphragm and C-leg of the tower bear greater stress.
重要日期
  • 会议日期

    12月08日

    2023

    12月10日

    2023

  • 11月01日 2023

    初稿截稿日期

  • 12月10日 2023

    注册截止日期

主办单位
IEEE IAS
承办单位
Southwest Jiaotong University (SWJTU)
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询