521 / 2024-06-28 17:34:28
The Environmental Impact and Control Technologies for the Construction of the Second Phase East Line of the South to North Water Transfer along the Coast
the South-to-North Water Diversion Project; the East Route Phase II; water diversion along the coast; environmental influence assessment; control techniques
全文录用
希圣 周 / 上海申通地铁建设集团有限公司
It’s a common view that the water shortage in northern China. This article creatively proposes to relocate the East Route Phase II Project of the South-to-North Water Diversion to the eastward appropriately, arranged along the coast of Jiangsu and Shandong province, and form a network for water diversion canal with the current East and Middle Routes, the Yellow Rivers, Hai Rivers, Luan Rivers, and Liao Rivers, etc., achieving a water diversion capacity of 50 billion m³/a or above [1,2]. The environmental influence of the project is the most important problem, especially the mudflat resources, biological communities, sensitive ecological protection areas, and the salt tide and ecological environment in the Yangtze River Estuary, etc. [3] The article systematically identifies the key elements and factors affecting the environment during the construction and operation of water diversion, establishes a state-pressure-response model for the environmental influence. A series of control techniques have been formed by innovatively proposing mudflat occupation compensation balance, smart water diversion, combined with Trenchless Construction, biological corridor, etc. The research shows that the proportion of mudflat resources occupied by the water diversion canal is small, and the environmental influence is relatively weak; After taking appropriate protection and compensation balance techniques, the range of mudflat resources and ecological protection areas along the coast route will increase rather than decrease, and the agriculture, forestry, marine ecology and regional environment will be greatly improved; Based on real-time online detection of the flow rate and the salinity of fresh water in the yangtze river estuary, the ecological environment can achieve excellent control. On the other hand, the vertical grade separation techniques with the existing rivers are used to prevent pollution caused by the natural rivers. The current water diversion projects and the natural rivers are utilized sufficiently by the East Route Phase II project, which has strong water diversion capacity, low construction and operation costs, wide service scopes, short cycle, and high integration degrees. It has extremely important strategic significance for fundamentally solving the water shortage problem in northern China. The project has good suitability from the perspective of the environmental influence.
重要日期
  • 会议日期

    10月14日

    2024

    10月17日

    2024

  • 09月30日 2024

    初稿截稿日期

  • 10月17日 2024

    注册截止日期

主办单位
国际水利与环境工程学会亚太地区分会
承办单位
长江水利委员会长江科学院
四川大学
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询