摘要
In the practical grid-connected operation of grid-forming converters, to adapt to the reduction of positive-sequence voltage components and the increase of negative-sequence voltage components caused by asymmetrical grid faults, a novel fault ride-through strategy is proposed in this paper. The proposed strategy deploys a second-order generalized integrator to extract the positive and negative sequence components precisely. It also deploys a negative-sequence current control loop to suppress negative-sequence components of the output current. Furthermore, the proposed strategy incorporates improvements in the power control loop, aiming to achieve power angle deviation suppression, inrush current suppression, and fast positive-sequence voltage support during asymmetrical grid faults. Finally, the effectiveness of the proposed strategy is validated through an experimental platform under different converter output conditions.
 
关键词
grid-forming,fault ride-through,asymmetrical grid fault,power angle,negative sequence current
报告人
Chenxi Bai
Assistant engineer Chengdu Power Supply Company;State Grid Sichuan Electric Power Corporation

稿件作者
Chenxi Bai Chengdu Power Supply Company;State Grid Sichuan Electric Power Corporation
Yuanhao Zhong Huazhong University of Science and Technology;School of Electrical and Electronics Engineering
Lihui Zhang Huazhong University of Science and Technology;School of Electrical and Electronics Engineering
Xiayan Li Huazhong University of Science and Technology;School of Electrical and Electronics Engineering
Ren Zhang State Grid Sichuan Electric Power Corporation;Deyang Power Supply Company
Yidan Chen Sichuan Aerospace Vocational and Technical College
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    11月07日

    2025

    11月09日

    2025

  • 09月10日 2025

    初稿截稿日期

主办单位
IEEE西南交通大学IAS学生分会
承办单位
西南交通大学电气工程学院
SPACI车网关系研究室
四川大学电力系统稳定与高压直流输电研究团队
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询