Target-Wise Adaptive Multi-Model Ensemble with Calibrated Uncertainty for Bill of Quantities Estimation in Indian Residential Construction
编号:191
访问权限:仅限参会人
更新:2026-11-18 23:21:26
浏览:62次
Online
摘要
Accurate Bill of Quantities (BOQ) estimation re- quires predicting many related construction quantities, and the best predictor can differ from one quantity to the next. This work studies a target-wise adaptive ensemble for fourteen BOQ outputs. Eight regressors (Ridge, Random Forest, MLP, XG- Boost, LightGBM, CatBoost, FT-Transformer and a Cross-Target Dependency Network, CTDN) are combined with a separate non-negative, sum-to-one weight vector for each target. The weights start from inverse validation error and are refined with constrained Sequential Least Squares Programming (SLSQP). A separate calibration subset is then used for split conformal prediction. All experiments use 100,000 synthetic residential records generated under CPWD-style assumptions; they are not contractor-verified project data. The average R2 on the hold-out test set for the ensemble is 0.919031, compared to 0.918786 for CTDN and 0.918795 for an XGBoost–FT-Transformer weighted ensemble. The improvement is small, and the MAE for CTDN is slightly smaller. The ensemble is also tested against stacked and Bayesian type weighting schemes, and its sensitivity to noise problems and its inference cost are given. Split conformal intervals give 94.83% coverage at the nominal 95%. Further real project validation is required before accuracy claims can be made.
关键词
bill of quantities, cost estimation in construction, adaptive ensemble, target-wise weighting, conformal prediction, uncertainty quantification, multi-output regression
稿件作者
Thirupathi S
Karunya Institute of Technology and Sciences
Dr. E. Grace Mary Kanaga
Karunya Institute of Technology and Sciences
发表评论