In order to solve the problem of the rational allocation of the each individual event time cost and reliability of equipment support activity, which makes the optimal of time-consuming and reliability of overall support activity, the optimal model of two-stage with inheritance relationship is built, namely model of time optimization stage and reliability optimization stage. In time optimization stage the improved ant colony optimization was used, the pheromone update rules based rank weight, adaptive adjustment of evaporation coefficient, crossover and mutation of GA (genetic algorithm, GA) was introduced into the design, the convergence property and global search capability of ant colony optimization were improved. In the second stage, the genetic algorithm is used to optimize the reliability of the results of the first stage. Finally, by modeling and analysis of equipment support activity procedures, improved ant colony optimization was better than the traditional ant colony optimization in convergence property and global optimization, the optimization of the time and reliability of the support activity is realized through the two stage optimization model designed in this paper.
重要日期
  • 会议日期

    07月09日

    2016

    07月10日

    2016

  • 07月06日 2016

    初稿截稿日期

  • 07月06日 2016

    终稿截稿日期

  • 07月10日 2016

    注册截止日期

主办单位
湖北众科地质和环境技术服务中心
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询